
Sewer System Mapping

NC One-Call
800-632-4949
System Performance Annual Report FY 2009
Click here for report.
|
Clarifiers
...go back a step.
|
The slowing of wastewater and the settling and removal of bio-solids is the goal
here. |
|
|
Although the wastewater has lost more than 85% of its strength, (BOD), at the
last stage, final removal of the bio-solids is necessary. |
|
|
Go with the flow... |
|